Sport centre, St. Lambrecht
|
Wood for athletes: The facilities were finished in 2004 and include a field, a training area and a zoned area for athletes, a club room, office, public bar and kitchen. Two thirds of the grandstand is covered and can seat about 500 spectators. The upper level is a wooden construction with about 520 m² of extensive, cross layered laminated panels.
|
Contact
Holzwelt Murau
Bundesstraße 13a
A-8850 Murau
Phone:
+43/3532/27 20 13
Email:
info@holzwelt.at
Additional Information
We would be pleased to combine this module with other modules for an individual programme!
Documents